Active production
Current activity across the factory floor
Recent activity
Latest workflow handoffs
Pallet PAL-260717-009 cleared for dispatch
Dispatch Operator · 8 minutes agoMaterial lot MP-260716-04 issued to Line 2
Inventory Operator · 21 minutes agoProduction order PO-0271 scheduled
Production Planner · 36 minutes agoCustomer order CO-1284 entered
Office Administrator · 1 hour agoCustomer order backlog
These orders have already been logged by the office. Select an active order to continue through production.
CO-1281 · AquaSur
Blue closure cap · Product CAP-BL-28
CO-1282 · Riego Central
White irrigation cap · Product CAP-WH-32
CO-1283 · AgroPacífico
Green sealing cap · Product CAP-GR-24
CO-1284 · HidroCampo
Black pressure cap · Product CAP-BK-40
Active production run
This screen represents what an operator or production supervisor could see during the current shift.
PO-0268
Blue closure cap · Product CAP-BL-28 · Line 2
Current tasks
Required before completing this run
Quality control
Review pending checks, approve the current run or simulate a quarantine decision.
Mid-run inspection · PO-0268
Confirm cap dimensions, colour consistency and sealing surface condition.
Material lot MP-260716-04
Accepted material currently issued to production Line 2. Use this action to demonstrate exception handling.
First-piece inspection · PO-0271
Inspection is scheduled when the white irrigation cap production run begins.
Finished pallet PAL-260717-009
Final packaging and label verification were completed before dispatch release.
Trace any production record
Search the example pallet, production order or raw-material lot.
Trace result
Backward trace from finished pallet to the source material.