BatchTrace demo

Production overview

Shift in progress

Six orders are active across three production lines. One quality check requires attention.

Open orders 14 4 due within 48 hours
In production 6 3 production lines active
Quality pending 1 Check awaiting approval
Ready to ship 9 Pallets cleared for dispatch

Active production

Current activity across the factory floor

PO-0268 · Blue closure cap Line 2 · Machine IMM-004 · Operator Production Operator
In production
PO-0271 · White irrigation cap Line 1 · Material preparation complete
Queued
PO-0264 · Green sealing cap Line 3 · 22,500 of 22,500 completed
Completed

Recent activity

Latest workflow handoffs

Pallet PAL-260717-009 cleared for dispatch

Dispatch Operator · 8 minutes ago

Material lot MP-260716-04 issued to Line 2

Inventory Operator · 21 minutes ago

Production order PO-0271 scheduled

Production Planner · 36 minutes ago

Customer order CO-1284 entered

Office Administrator · 1 hour ago

Customer order backlog

These orders have already been logged by the office. Select an active order to continue through production.

CO-1281 · AquaSur

Blue closure cap · Product CAP-BL-28

In production
Quantity 25,000
Due date 18 July
Priority High

CO-1282 · Riego Central

White irrigation cap · Product CAP-WH-32

Planned
Quantity 18,000
Due date 19 July
Priority Normal

CO-1283 · AgroPacífico

Green sealing cap · Product CAP-GR-24

Ready to ship
Quantity 22,500
Due date 17 July
Pallets 9

CO-1284 · HidroCampo

Black pressure cap · Product CAP-BK-40

New
Quantity 12,000
Due date 22 July
Priority Normal

Active production run

This screen represents what an operator or production supervisor could see during the current shift.

In production

PO-0268

Blue closure cap · Product CAP-BL-28 · Line 2

Materials accepted
18,400 of 25,000 units produced
Machine IMM-004
Operator Production Operator
Started 09:18
Raw material MP-260716-04
Colour lot COL-BL-0716
Current cycle 14.2 seconds

Current tasks

Required before completing this run

Material verification Lot and formulation confirmed
Done
First-piece inspection Dimensions and colour accepted
Done
Mid-run quality check Approval still required
Pending
Finished pallet creation Available after production completion
Upcoming

Quality control

Review pending checks, approve the current run or simulate a quarantine decision.

Mid-run inspection · PO-0268

Confirm cap dimensions, colour consistency and sealing surface condition.

Pending

Material lot MP-260716-04

Accepted material currently issued to production Line 2. Use this action to demonstrate exception handling.

Accepted

First-piece inspection · PO-0271

Inspection is scheduled when the white irrigation cap production run begins.

Scheduled

Finished pallet PAL-260717-009

Final packaging and label verification were completed before dispatch release.

Released

Trace result

Backward trace from finished pallet to the source material.

Complete chain
Raw material MP-260716-04 Polypropylene resin received 16 July and accepted by quality control.
Production batch PO-0268 Blue closure cap manufactured on IMM-004 during the current shift.
Finished pallet PAL-260717-009 2,500 finished caps packed, labelled and released.
Shipment GUIA-10455 Prepared for AquaSur. Dispatch inspection completed.